New construction and 11th-month warranty inspections.

"It's new" and "it was built right" are different claims. What a delivery inspection covers, why month eleven has a deadline and who has to act on it, and what a builder gains from documenting the build itself.

Buyers of new homes are routinely told they don't need an inspection: the city inspected it, the builder warrants it, nothing has had time to wear out. Each of those is true and none of them is the point.

What the city inspection is, and isn't

Municipal building inspections check that the work meets the adopted building code at specific stages. The inspector is checking for code minimum, on a schedule, across many houses a day, and is working for the jurisdiction. They are not checking whether the shower pan was tested, whether every bath fan actually terminates outdoors, whether the attic insulation is at the depth on the certificate everywhere and not just near the hatch, or whether the crawlspace was left with scrap lumber and a torn vapor barrier the day the floor went on. Those are workmanship questions, and nobody working for the buyer has looked at them.

A builder's own quality process catches a lot. It also runs on the same subcontractors and the same schedule pressure that produced the work. An independent inspection is a second set of eyes with no stake in the schedule.

The delivery inspection

A Ridgescan delivery inspection is a full capture of the finished home, done before closing or at the walk-through: drone over the roof and envelope, radiometric thermal on every wall and ceiling, 360° of every room, the rover through the crawlspace, and every item in the Ridgescan Standard checked for completeness before the crew leaves. The report is reviewed and signed by a certified home inspector and delivered the same day.

On new houses the findings cluster in predictable places:

  • Roof: exposed or missing fasteners, flashing not sealed at penetrations, damaged shingles from late-stage trades walking the roof.
  • Attic and insulation: insulation pushed aside around fixtures, bath fans or dryer vents terminating in the attic, missing baffles at the eaves.
  • Thermal: empty or slumped insulation bays, air leakage at top plates and around windows, missing insulation behind tubs and showers on exterior walls.
  • Crawlspace: construction debris, a vapor barrier that doesn't cover the ground, ducts left disconnected, plumbing drips at new fittings.
  • Electrical and plumbing tests: GFCI and AFCI devices that don't trip, reversed hot and cold, fixtures that leak under load, water pressure above what fixtures are rated for.
  • Grading and drainage: soil sloped toward the foundation, downspouts discharging at the corner, sprinkler heads aimed at the house.

None of these show up at a walk-through with a clipboard. All of them are easier to get fixed before closing than after, when the builder's warranty department becomes the path.

Why month eleven

Most builders provide a written warranty that covers workmanship and materials for the first year after closing, with longer terms for specific systems and the structure. The details are in the warranty document the buyer signed; read it, because terms vary. The one-year workmanship coverage is the broadest part, and it's the part that expires first.

A house also needs a year to show what it's going to do. Lumber dries and shrinks, so drywall cracks and nail pops appear. The house goes through a heating season and a cooling season. Grading settles. The crawlspace sees its first irrigation summer. A leak that was a drip at closing has had time to stain. Inspecting in the eleventh month catches what the first year revealed while there is still time to file a claim under the one-year coverage.

The 11th-month inspection repeats the delivery capture: same tools, same Ridgescan Standard, same house. The report tags each finding Safety, Major, Maintenance or Monitor, and the buyer submits the warrantable items to the builder with the photos, thermal frames and readings attached. A claim with evidence is a different conversation from a claim that says the floor feels bouncy.

One thing to be clear about: the 11th-month inspection is the owner's to book. Builders don't schedule it, and most don't remind you. Ridgescan reminds every owner we delivered a report to about a month before the one-year workmanship coverage ends, and the delivery report is the baseline the claim is judged against.

What builders get from it

Builders sometimes see independent inspection as friction. The ones who use it during the build see it the other way around, because the expensive defects are the ones the drywall hides.

  • Lots that walk into the city inspection ready. A capture the day before, scored against the items that inspection checks, with anything open sent to the trade. A failed inspection costs a week of schedule; a fixed nail plate costs an hour.
  • Schedule by lot, updated by the capture. Each phase capture stamps the lot's record, so the community view shows which lots are ready, waiting on a trade, or behind, without anyone updating a spreadsheet.
  • Subs scored by trade. Findings carry the trade that owns them. Across a community that is a per-sub record of what they miss, how often and how fast they fix it, with photos, before the next contract.
  • Rough-in defects fixed the week they happen. A pre-drywall capture, scored against the same list on every lot, puts a missed nail plate, a kinked duct or a drain with no slope in front of the trade that did it while they are still on site. The same defect found in year one means opening a finished wall.
  • Findings routed by trade. Each flagged item carries the photo, the location and the trade that owns it. The super sends it once, to the right sub, instead of walking twenty lots to find it.
  • A map of what's inside the walls. The pre-drywall 360° of every room is a permanent record of where the lines run. Useful at a warranty call, a remodel, or a resale.
  • A documented baseline at closing. A signed delivery report is proof of the house's condition on day one. When an owner calls in month eight about a crack, the record shows whether it was there.
  • Feedback by subcontractor and by detail. The same defect across a community points at a sub or a detail, not at bad luck. That's a change to the process, and it stops the defect in the next phase.
  • Buyer confidence at the sale. Offering an independent delivery inspection with every closing is a plain, checkable thing to say about quality.

Every phase sits on one record per home, scored against the same list, so change over time is documented rather than argued.

For buyers under contract on a new house

You can order a delivery inspection yourself; it doesn't require the builder's program. Book it for the days before your final walk-through so the findings can go on the builder's punch list, and put the 11th-month date on your calendar the day you close. The report's repair-request summary works for a builder punch list the same way it works for a resale addendum.

Get started

Book an inspection.

Tell us about the property and when you need the report. We'll confirm a time by email.

  • Emailhello@ridgescan.ai
  • Based inEagle, Idaho · serving the Treasure Valley
  • Certified inspectorsReview and sign remotely with Ridgescan. Ask us how.
We'll only use your email to reply to this request.